Ironmaster Client Quotes
Ironmaster Client Quotes
“We have had real problems in the past with road repair systems failing after relatively short periods of time and knew that something more robust was needed for major traffic routes. The results of our study highlighted the fact that Ironmaster was the most suitable system for these roads and the five-year warranty will not only save us money in the long run, but will reduce disruption caused by the need to reinstate failed repairs"
“The previous system we used kept cracking. We chose Ironmaster because of the five-year warranty, and we’ve had no problems at all with the repairs we’ve had done.”
“…it has worked so well for us, that we will in future, use Ironmaster on all problem ironwork”
"We were really struggling with failing ironwork on some busy, heavily trafficked routes within Bolton; we were losing money with repeated road closures and ironwork collapses. Rhino guaranteed they could help - and we have not been disappointed. They first installed Ironmaster back in 2014 and it's still holding strong. We are still using them to solve any problems we have with our gullies and manholes especially on our busy roads and bus routes. We have less disruption and are saving money - it's one thing less to worry about!"
"We rely on Rhino because of their system, certification, workmanship & reliability. They applied the same skills and attention to detail in getting the multi-span cover correct. It is a specialist job for which they are ideally suited"
"Rhino Asphalt Solutions Ltd were in all aspects of planning very professional, and the quality of their products at the Medway Tunnel are great."